COPIED
4 mins

BRINGING CLARITY TO COMPLEX EDUCATION PROJECTS

Adam Douglas, Project Director at AIS, explains why getting the right support from specialists can help schools make the right choices.

Schools often approach construction and refurbishment projects while under pressure, battling tight timelines, unclear scopes and uncertainty about who to engage first. This isn’t due to a lack of care; it’s more a reflection of the competing priorities that school leaders face.

Curriculum planning, safeguarding, inspections and meeting the needs of students often come before estate management, meaning building projects can sit quietly in the background until a deadline suddenly creeps up.

When this happens, schools can find themselves making complex decisions at speed, often without all the information needed to move forward confidently. But there are ways to avoid this by engaging the right people at the right time, leaning into specialists and getting the support needed to create a clear, phased approach to planning and delivery.

PEMBRIDGE HALL SCHOOL, NOTTING HILL GATE

School buildings and facilities which set the benchmark for excellence in private education are the backbone of Inspired Education. AIS works closely with the group to ensure its spaces allow pupils to achieve their maximum potential and help them grow into well-rounded individuals, all while causing minimal disruption to the school calendar. The relationship began in 2024 with refurbishment works across four buildings at Pembridge Hall School. Working during the Easter holidays, the plans included modernising 12 classrooms, including the installation of interactive Teacher Walls, improvements to the staffroom, the creation of a new office for the Head, installation of new WCs and a shower room and external landscaping and decoration. AIS has since gone on to carry out works across a further 10 schools under the Inspired Education group.

THE SWEET SPOT FOR PLANNING

No matter the sector, early engagement consistently leads to better project outcomes. When schools, architects and delivery partners have conversations at the very beginning, together they can establish realistic budgets, identify challenges, and build programmes that work with term times.

Our rule of thumb is to work to a 90-day plan, covering three key stages, to bring order and confidence to the early stages of a project:

• Assess (Day 0 to 30): Understand and challenge the project baseline including reviewing designs, engaging stakeholders, assessing programme, risks, supply chain and cost, undertaking surveys and validating existing information. The goal is to have a clear, evidence-based understanding of the project.

• Develop (Day 30 to 60): Define the strategy and align the team. At this stage we want to achieve a coordinated design, agreement on the strategy and align the team for delivery.

• Deliver (Day 60 to 90 and beyond): Mobilise and execute with control, commencing works or early enabling activities. At this point the project is fully underway with clear control across delivery, cost and quality. That timeframe allows for proper planning without losing momentum.

Once clarifications have been made around the scope and scale of the works those durations can be reduced leaving everyone with a clear, phased roadmap.

CHOOSING THE RIGHT TEAM

For architects and developers working in the education sector, a recurring challenge is that schools often begin with an incomplete understanding of the roles required to deliver a project. This can result in architects and developers being the first point of guidance, fielding questions about feasibility, budgets and delivery before a full team is in place.

Establishing clarity around responsibilities early on helps ensure that design, cost planning and programme development progress in tandem.

Working with a main contractor who can outline the different pathways is vital. For straightforward refurbishments, a consolidated route involving fewer parties can streamline decision making.

For larger or heritage sensitive projects, a broader consultant structure can be more appropriate and often mandated by the schools themselves. The focus should be on helping schools understand how the pieces fit together, so architects can progress confidently without being left to fill gaps that sit outside their remit.

BRINGING IN THE SPECIALISTS

The importance of specialist knowledge can’t be underestimated. For the best chances of success, it is key to draw on teams who understand the nuances of school environments and can consider everything from safeguarding and circulation to spatial needs and the pressures of working in live settings or to tight school holiday deadlines.

Early feasibility studies, proposed layouts and initial design options can help schools understand what is possible before a full consultant team is assembled. These early insights are even more effective when paired with input from teams who understand the practicalities of delivery. When all workflows develop in tandem, schools gain a more accurate picture of what can be achieved within their budget and timeframe. It also reduces the risk of surprises along the way, particularly in heritage buildings where hidden elements can quickly delay a project.

A CONFIDENT ROUTE FORWARD

Education projects are rarely straightforward. They involve multiple stakeholders, immovable deadlines, operational constraints and, in many cases, complex or historic estates. But with early engagement, clear roles and responsibilities, and the right blend of specialist expertise, schools can move quickly from uncertainty to clarity.

For architects and developers, this approach provides a more stable foundation for design work. For schools, it offers reassurance that the project is being guided by teams who understand both the educational context and the practical realities of construction.

ais-interiors.com

This article appears in May-26

Go to Page View
This article appears in...
May-26
Go to Page View
LETTER FROM THE EDITOR
T he features we’re running in this month’s
Building materials supply reaching ‘crisis point’
Increasing labour, energy and logistics costs are pushing
Boiler Upgrade Scheme budgets increase
The budget available for the Boiler Upgrade Scheme
Housing market listings increase by 6%
The English housing market has increased since the
Massie joins Proctor Group
A new Commercial Director has joined the Proctor
Genous acquires Cotswold Energy
Intelligent home retrofit company Genous has acquired Cotswold
Biodiversity net gain needs reform, says HBF
Difficulties in implementing current biodiversity net gain (BNG)
WILL E-METHANE BECOME RELEVANT TO THE UK AND EU MARKETS?
Chris Goggin from Rinnai explains how e-methane is produced and its potential relevance for the UK alternative gases market.
A DEEP DIVE INTO THE BIGGEST INSTALLERSHOW YET
InstallerSHOW 2026 arrives as a transformative event for the installation, trade and built environment sectors.
THE PLUMBING INNOVATIONS ENABLING SUSTAINABILITY
Lee Halstead , Technical Sales Engineer for RWC , reveals three products specifiers should be using to maximise sustainability.
PROTECT HERITAGE BUILDINGS THROUGH CLEAR DOCUMENTATION
Chun Chiu , Design Manager at ACT , outlines how to protect historic buildings through proactive risk control.
SOURCE A BETTER FLUSH
Richard Braid, Managing Director at Cistermiser, explains how upgrading older flushing systems offers a practical way to cut water waste and meet efficiency targets.
DON’T TURN DEVELOPMENTS INTO NATURE DESERTS
New research shows that younger first-time buyers in
VENT-AXIA WELCOMES FUTURE HOMES STANDARD
Ventilation manufacturer Vent-Axia has welcomed the Future Homes Standard,
INCREASING THE SPEED OF TIMBER FRAME CONSTRUCTION
The UK must cut building sector carbon emissions to hit net zero targets. Quick build, low eco-impact timber frame construction could help, explains Arclin .
KEEP HEAT PUMPS RUNNING SMOOTHLY LONG TERM
David Holley , Technical Manager, Chemistry at Fernox , explains how to make sure heat pumps are protected effectively and stay efficient.
SPECIFYING THE FABRIC OF OUR FUTURE HOMES
Philip Beckett , Technical Support Specialist at Knauf Insulation , explores what the Future Homes Standard means when designing new buildings.
DISTRICT HEATING ‘KEY TO ACHIEVING FHS GOALS’
REHAU Water Technologies highlights the importance of heat networks in achieving carbon reduction targets.
TG ESCAPES PROVIDES MODULAR CHANGING PAVILION FOR CFOS
T he timber frame changing facilities at the new
FUTUREPROOF AGAINST RISING HEAT
Tim Mitchell from Klima-Therm explores how the latest HVAC technologies can safeguard learning environments against rising temperatures while supporting net zero goals.
OPTIMISING WELLBEING IN EDUCATION DESIGN
Paul Knifton , Strategic Accounts Director at Pick Everard , considers how to be creative with wellbeing design in schools within a standardised framework.
BALANCING SECURITY, SAFETY AND ACOUSTICS
Rob Mottram , Head of Product and Compliance at Robust UK , explains the importance of choosing the right doorset to ensure safety and performance in schools.
BRINGING CLARITY TO COMPLEX EDUCATION PROJECTS
Adam Douglas , Project Director at AIS , explains why getting the right support from specialists can help schools make the right choices.
CLEMENT MANUFACTURES INTRICATELY SHAPED HEAD STEEL WINDOWS FOR HISTORIC SCHOOL
C lement Windows Group recently manufactured replacement steel
POWERING MODERN SPECIFICATION
From heavy-duty plugs and sockets to bespoke distribution units, Ceenorm is helping specifiers bring safe, reliable and flexible electrical infrastructure into modern building projects.
NORDIC CLADDING SYSTEMS FOR CONTEMPORARY FACADES
Finnish manufacturer Siparila has expanded its UK presence, offering timber cladding systems to specifiers and developers.
SLATE BRINGS RESILIENCE TO TENEMENTAL ROOF
P erspective Building Consultancy appointed Roofing Advisors UK
WESTWOOD LAUNCHES LOW ODOUR FLAT ROOF MEMBRANE
WestWood Liquid Technologies has launched a low odour,
LOW-PITCH CHALLENGE FOR HISTORIC GRADE II RENOVATION
A home renovation in the Yorkshire Dales National Park has used Onduline’s ISOLINE LOW LINE system. Specify & Build reports.
SOURCING FIRE SAFETY AND MEMBRANE SPECIFICATIONS
Pamela Howat , Senior Technical Advisor at Proctor Group , explores fire classifications and what specifiers need to know.
STAINLESS STEEL SUBSTRUCTURES UNLOCK THE POTENTIAL FOR SUSTAINABILITY
The design and materials used in rainscreen facades can make a real difference to achieving thermal performance targets. Gary Robson, Business Development Manager at EJOT UK, explains why.
EXTINGUISHING THE FLAMES AND RISKS IN FLAT ROOFING
Simon Ashworth , Portfolio Manager – Flat Roofing at BMI Icopal , explains how innovation is reshaping flat roofing installation.
GLIDEVALE PROTECT ROLLS OUT NEW PRINTED ROOFING MEMBRANE GUIDANCE
John Mellor , Head of Marketing at Glidevale Protect , explains the rationale behind printing clear and concise fixing instructions directly onto its pitched roofing underlays.
THE DEVIL IS IN THE DETAIL(ING)
Don & Low explains how to specify membranes that perform where airtightness gets complicated.
REFRESH YOUR CPD HOURS.
Choose from one of our RIBA-approved CPD Seminars.
FACING THE RETROFIT CHALLENGE
The Insulation Manufacturers Association (IMA) explores the scale of the UK ‘s retrofit challenge and how proper insulation can help.
CABERDESK PROTECTS ESSEX HOUSING DEVELOPMENT
West Fraser’s CaberDek structural flooring has been specified
WHAT DOES THE CIRCULAR ECO
Cathie Clarke, CEO of the UK Sustainable Flooring Alliance, explains what flooring specifiers need to know about the circular economy.
NOMY MEAN FOR FLOORING?
green jobs by adopting more circular business models.
IT’S ALL ABOUT THE FLOORING
The Contract Flooring Association is the leading independent
HOW LANDSCAPING ARCHITECTURE CAN FUTURE-PROOF URBAN SPACES
Sol Russell , Technical Team Leader at Kinley , highlights how focusing on sustainable solutions can mitigate the urban heat island effect.
RETHINKING BOUNDARY SPECIFICATION
Birkdale explores why boundary designs are under increasing scrutiny as specifiers look to balance sustainability and longevity.
THERMOBLOCKS UNDERPIN ABBEY RESTORATION
The £4.8 million restoration and redevelopment of the
SONAS BATHROOMS DEBUTS TWO NEW COLLECTIONS
SONAS Bathrooms has debuted two new collections –
ALPHA HEAT PUMP SUCCESSFUL IN NEW HEATING PROTOTYPE
Alpha has provided its Magis M heat pump
R-PRESS FITTINGS NOW AVAILABLE THROUGH BES
R-Press fittings from Instantor are now available through
48-HOUR DELIVERY SERVICE
Stelrad has introduced a free 48-hour quick delivery
THE FUTURE ROLE OF GAS
Rinnai marketeer Beckie Lam presents the results of a survey on ‘The Future Role of Gas in UK Heating and Hot Water’.
THE SUPREME LOFT LADDER
The ‘Supreme’ from Premier Loft Ladders combines heavy-duty
STEEL GAZING SYSTEM ACCOUNTS FOR ONE-THIRD OF CONSUMER SALES
Steel window and door manufacturer Crittall Windows has
PARTNERSHIP INTEGRATES SMART SENSOR TECH
Sternfenster has strengthened its position by integrating Sense
QUALITY PRODUCTS SUPPORT HOMES IN MALTA
Energy Savings Solutions of Malta, headed by Franco
HYBRID SYSTEM DELIVERS LOW-CARBON HEATING
A hybrid commercial heating system from Ideal Commercial
Looking for back issues?
Browse the Archive >

Previous Article Next Article
May-26
CONTENTS
Page 35
PAGE VIEW