COPIED
3 mins

COMPREHENSIVE SUPPORT

Keira Proctor, Managing Director at Proctor Group, looks at how manufacturers can better support projects from the design stage to the construction phase.

Early engagement with product manufacturers can be critical to a project’s success, as nobody knows a construction product better than its manufacturer. But early engagement is just one facet of technical support.

Delivering construction projects competently means drawing on expertise to support design and construction decisions. However, when the levels of support available varies from one manufacturer to another, it’s little wonder that specifiers can be reluctant to commit to early design decisions.

Many manufacturers, including Proctor Group, offer heat loss and condensation risk calculation services. These are usually based around the combined method for calculating thermal transmittance (as per BS EN ISO 6946), accompanied by simplified Glaser method condensation calculations (as per BS EN ISO 13788).

Condensation risk is linked to the complex topic of moisture movement in buildings. More detailed numerical simulation (as per BS EN 15026) analyses heat, vapour and moisture transfer through a building element. It gives an accurate measure of temperature, relative humidity and water content within the element. The most well-known form of numerical simulation is WUFI calculations. While the Glaser method provides a simple pass/fail result, numerical simulation requires results to be analysed and understood. That can be a time-consuming process. However, it’s vital to undertake deeper analysis in certain situations – especially traditional/ historic building fabric with solid wall constructions. That is why we offer WUFI calculations as an additional service, alongside U-value calculations and Glaser method analysis.

Simplified methods of assessing condensation risk are not appropriate in all scenarios, but that doesn’t stop some from issuing calculations anyway due to a lack of competence or awareness. It’s essential to work with a manufacturer that can properly guide you to, and provide, appropriate calculations.

MAKING THERMAL BRIDGING SOLUTIONS MORE ACCESSIBLE

That sentiment applies equally to psi value calculations. Tightening regulations make it difficult to ignore the impact of thermal bridging heat losses. Nevertheless, some projects ignore thermal bridge detailing because sourcing calculations is perceived to be complicated and time consuming.

Working with a manufacturer who can analyse hard-to-treat areas of building fabric has the potential to make a significant positive difference to project specifications. Thin aerogel insulation is ideally suited to details where conventional insulation thicknesses are impractical, and we offer a psi value calculation with our Spacetherm products. In this way, we support project teams to improve overall energy efficiency, deliver better occupant comfort, and close the performance gap between as-designed and as-built.

MAKE DESIGN DECISIONS WITH CONTRACTORS IN MIND

The ability to carry support through the design stages and on to site can make for better project outcomes. Longer-term, comprehensive support makes it more likely that design intent is realised in the finished, occupied building.

It’s impossible for contractors to be aware of, and familiar with, every single product on the market. As such, specifying products where the manufacturer can provide on-site support may help contractors to get the best out of what they are installing.

At Proctor Group, our support for contractors is two-pronged. First, we offer toolbox talks to help contractors understand the fundamentals of products they might not be familiar with. In recent years we have seen our Wraptite membrane used on a host of new Passivhaus school and community campus projects across Scotland. Despite Wraptite being 15 years old, many contractors have only used it for the first time to help achieve Passivhaus airtightness. Toolbox talks have played a vital role in making sure they get the benefits from Wraptite at the first time of asking.

Second, site observation reports give contractors ongoing confidence that an installation is proceeding as necessary. The value of these site visits and reports is such that one contractor actually had it written into a contract that we had to be granted site access for the purposes of observing an installation. Together, these two forms of site support back up the support provided through our calculation services.

proctorgroup.com/support-andservices

This article appears in Jul/Aug-26

Go to Page View
This article appears in...
Jul/Aug-26
Go to Page View
LETTER FROM THE EDITOR
A s we move into the second half
Recovery delayed as project starts fall sharply
Construction activity across the UK weakened further during
New CIBSE guidance to tackle overheating in homes
CIBSE has updated its TM59 Overheating risk in
‘AI can’t build a house’, warns MP
Sarah Edwards MP has urged the Government to
Rental homes fail thermal comfort standards
An estimated 441,000 private rented homes in England
One Equity Partners acquires Leviat
Leviat, a global leader in engineered connection, fastening
Uncertainty and rising costs sees confidence collapse
There has been a sharp deterioration in confidence
Housing completions set to miss target
Housing delivery in England is set to remain
Glidevale Protect supports the next generation
Glidevale Protect has lent its support to five
A VERSATILE PANEL SOLUTION
As builders face growing pressure to balance performance,
PROCTOR GROUP LAUNCHES NEW FIRE-RATED EXTERNAL WALL MEMBRANE
Facadeshield FR Class B is the latest addition
COMMERCIAL HEAT PUMPS COULD BE THE FUTURE
Rinnai Director Chris Goggin looks at current domestic energy policy and the movement towards widespread electrification.
ESBE ENGAGES WITH INSTALLD FOR FACTORY VISIT
Eight golden tickets took a group of installers
A HEAT PUMP BUILT FOR THE REAL WORLD
Alpha has expanded its renewable heating technology range
WELLINGTON BOOT IT WITH CAVITY TRAYS
It’s a damp protection approach used by many
MAXIMISING EFFICIENCY IN FACADE PROJECT DELIVERY
Jon Knaggs, Technical Manager for Industrial Lightweight Construction at EJOT UK, explains why the ETA is crucial for compliance and key to faster, lower-risk project delivery.
WORKING BLOCK BY BLOCK
Ian Dean, Managing Director, Concrete Products at Holcim UK, explains why early collaboration is key to Future Homes Standard success.
TACKLING URBAN HEATING CHALLENGES
Specify & Build met with Qvantum UK to learn why its water-to-water heat pump has been created for apartment developments.
ARE UK HOMES READY FOR THE NEXT WATER REALITY?
Ed Morris , Technical Manager at Altecnic , explores what water scarcity means in practical terms, and what future regulation changes could mean for residential system design and specification.
SUPPORTING HIGH-QUALITY STUDENT LIVING IN NOTTINGHAM
Vent-Axia has delivered high-performance ventilation across Centre Court,
GET THE MEASURE OF ROOF SAFETY
Matthew Sexton, Technical and Compliance Director at BMI UK & Ireland , explores the technology reducing risks while working at height.
DELIVERING CERTIFIED PASSIVE HOUSE FACADES AT SCALE
Metal Technology has become a trusted partner for certified Passive House facade systems in the UK and Ireland.
STEP-BY-STEP ROOFING SOLUTIONS
Building products manufacturer Glidevale Protect has supplied a range of roofing and ventilation solutions to the refurbishment of a mixed-use residential scheme in Bristol.
MAKING COLOUR COUNT
Elaine Gilligan at K Rend examines the role of colour in external facades and how the right render can elevate a building’s aesthetic.
COMPREHENSIVE SUPPORT
Keira Proctor, Managing Director at Proctor Group , looks at how manufacturers can better support projects from the design stage to the construction phase.
LOW-PITCH SOLUTION KEEPS PAVILLION ON TRACK
A new community sports pavillion in Milton Keynes highlights how adaptable roofing design can help resolve low-pitch specification challenges without delaying construction.
CLOSING THE EVIDENCE GAP
W ith the Future Homes Standard expected to
HARNESSING THE LATEST TECH TO PROVE CARBON REDUCTION CREDENTIALS
Stuart Nicholson , Managing Director of Marley , highlights how a groundbreaking concrete tile is setting a new standard in the UK roofing industry.
THE GROWING CHALLENGE OF SCHOOL FLAT ROOFS
Justin Pitman , Sales Director at Proteus Waterproofing , explains why understanding the condition of thousands of ageing flat roofs in schools will soon be important for specifiers.
MANAGING PROFESSIONAL RISK
Valcan and Consort Insurance explain what the recent changes in Professional Indemnity insurance means for building design risk.
SPECIFY ONCE, SPECIFY RIGHT
Gary Doxey , Commercial Manager at Eurocell , explains why he believes PVC-U is still the best material choice to achieve net zero.
REPLICATING 1910 STYLE
Silent View Windows Commercial has won an award for the restoration of a former NatWest Bank using Residence 9 windows.
MODERN SPECIFICATION
With pressure on specifiers to deliver projects that balance performance, compliance and design, VIAL Doors & Windows is a specialist provider of aluminium doors and windows.
NEW SMARTACCESS MULTISCAN BIOMETRIC SOLUTION
FUHR has expanded its smart access control range
PROTECTING COASTAL VIEWS
Stunning riverside location needed coastal grade protection from Reynaers Aluminium while delivering expansive views.
THE KEY TO SPECIFYING AI
Tom Planck , Managing Director of John Planck , discusses the key architectural ironmongery factors to consider with any project.
THE FRONT LINE OF INNOVATION
Vicaima doors have brought new life to a former military HQ transformed into contemporary apartments and cottages.
CARBON CLAIMS NEED CLARITY
Senior Architectural Systems is calling on the fenestration industry to move beyond top-line figures to a more evidence-based approach that gives specifiers more accurate data.
SENSE BY MACO WINS TWO AWARDS
MACO was awarded Gold in the German Innovation
GARDEN VILLAGE WELCOMES WINDOW WIDGETS
Window Widgets will soon see a selection of
LUXURY ALUMINIUM AND STEEL ENTRANCE DOORS
Alunet Systems and JD Door Systems, part of
REDEFINING EMERGENCY EXIT DOOR DESIGN
Robust UK, a leading UK manufacturer of steel
A COST-EFFECTIVE ROUTE TO COMPLIANCE
Rinnai Director Chris Goggin explores the financial and ecological benefits of hybrid technology in heating and hot water delivery.
NEW REPORT HIGHLIGHTS THE NEED FOR CHANGE
Rekha Thawrani OBE , Global Director at NEC Contracts, explores the findings of recent research and what it means for future projects.
SPECIFYING FOR RISK
Simon Hemmings , CEO of Pinpoint , explains how specifying the right systems can help protect healthcare staff against violence.
WHY THE BSI KITEMARK MATTERS IN FIRE AND LIFE SAFETY
AICO’s Andy Speake explains why the BSI Kitemark remains a vital symbol of quality for the industry.
NEW PASSIVE FIRE PROTECTION FOR PRECAST CONCRETE FACADES
Siderise has launched its new PC-FS Firestop and
FIRE DAMPERS - THE HIDDEN SAVIOUR
Gary Nicholls , Managing Director at Swift Fire Compliance , explains where projects can fall short and what specifiers should do to ensure compliance and safety.
TEXTURED FINISHES ENHANCE STYLISH RANGE
Daikin has expanded its award-winning Stylish air-to-air heat
KINGFISHER LOUVRES PRODUCTS NOW ON NBS PLATFORM
Specialist aluminium architectural louvre manufacturer Kingfisher Louvres has
LPG CONVERSION KIT AVAILABLE FOR GREENSTAR 1000
Worcester Bosch has increased the accessibility of its
BREAKING NEW GROUND WITH PASSIVHAUS LEISURE CENTRE
The brief for Eclipse Leisure Centre was unprecedented:
RESTORING THE LIGHT AT SWANSEA STADIUM
The refurbishment of the roof on the east
FOREST SCHOOL RECEIVES SUSTAINABLE CLADDING SOLUTION
CUPACLAD 101 Logic has been specified by Lungfish
SHAPING A REFINED WORKSPACE THROUGH FLOORING
Tucked away in a green pocket of London
WHEN TWO SOURCES ARE BETTER THAN ONE
Rinnai’s Pete Sneddon reviews the benefits of purchasing a low-carbon hybrid heating and hot water system.
Looking for back issues?
Browse the Archive >

Previous Article Next Article
Jul/Aug-26
CONTENTS
Page 35
PAGE VIEW